胜利油区整装油藏特高含水期水平井 提高采收率技术
DOI:
作者:
作者单位:

作者简介:

宋勇(1980—),男,山东泰安人,高级工程师,硕士,从事油气田开发方案编制及油藏数值模拟研究。联系电话:13854604469,E-mail:songyong387.slyt@sinopec.com。

通讯作者:

基金项目:

中国石化科技攻关项目“整装油田水平井提高采收率油藏工程优化技术”(P10074)


EOR technology for the horizontal wells at extra-high water cut stage in integrated oil reservoirs of Shengli oilfield
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    由于对胜利油区整装油藏特高含水期水平井驱油机理的认识不足,原有的水平井设计技术不能满足当前油 田开发需要,水平井的设计难度加大,开发效果不理想。为此,根据实际矿场动态数据,以物理模拟相似准则为基础,建立大型物理胶结模型实验,开展水平井提高采收率研究。引入驱油效率贡献率和波及系数贡献率,以揭示水平井提高采收率的机理,并利用数值模拟技术对储层纵向渗透率级差、夹层渗透率、水平井方位和水平井部署时机等参数进行了影响规律研究。结果表明,水平井投产初期以增大波及系数为主,特高含水期以提高驱油效率为主。储层纵向渗透率级差越大,夹层渗透性越低,水平井的方位越接近垂直于注水井连线方向,水平井部署时机越早,在同一含水率时,波及系数贡献率越低,驱油效率贡献率越高。

    Abstract:

    The integrated oil reservoirs have stepped into extra-high water cut stage. Original technologies don’t fit to the current development situation,and the design of horizontal wells has become more difficult and the development effect is restricted to the deficient understanding about oil-displacement mechanism of horizontal wells at this stage. A large-scale consolidated model was built based on the similarity criterion in physical simulation according to the practical production data. Enhancing the oil recovery by the horizontal wells was studied. EOR mechanism of the horizontal wells can be re? vealed through the introduction of contribution rate of oil displacement efficiency and contribution rate of sweep efficiency.The influence of vertical permeability ratio,interlayer permeability,horizontal wells direction and the drilling time on oil recovery were studied with numerical simulation. The result shows that sweep efficiency may be improved at early stage of production and the oil displacement efficiency should be enhanced in the extra-high water cut stage for the horizontal wells.The horizontal well is more perpendicular to the line of injection wells the higher the vertical permeability ratio is and the lower the interlayer permeability is. The contribution rate of oil displace efficiency is higher at the same water cut the earlier the deploying time of horizontal well is and the lower the contribution rate of sweep efficiency is.

    参考文献
    相似文献
    引证文献
引用本文

宋勇.胜利油区整装油藏特高含水期水平井 提高采收率技术[J].油气地质与采收率,2015,22(3):119~123

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2015-06-03
×
《油气地质与采收率》
《油气地质与采收率》启动新投稿网站的公告