CCUS-EOR开发同步埋存阶段长度的确定方法
作者:
作者单位:

作者简介:

王高峰(1980—),男,河南许昌人,高级工程师,硕士,从事注气技术研究工作。E-mail:wanggaofeng@petrochina.com.cn。

通讯作者:

基金项目:

中国石油上游科技项目“碳驱油碳埋存一体化协同技术研究”(kt2022-8-20)和“冀东高深北区高66X1断块Es33II油组碳驱油碳埋存先导试验”(2022ZS0806)。


Method for determining time length of simultaneous sequestration phase of CCUS-EOR development
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    CCUS-EOR开发周期分为同步埋存和深度埋存两大阶段,确定同步埋存阶段长度是CCUS-EOR开发方案设计的一项重要内容。根据CO2驱产油量变化情况,可将同步埋存阶段进一步划分为上产期、稳产期和递减期。上产期的时间长度由见气见效时的累积注入量与年注气速度计算,稳产期的时间长度即稳产年限借助气驱“油墙”集中采出时间测算,递减期内的阶段采出程度变化情况则利用典型产量递减规律研究,气驱产量递减率和稳产期采油速度需根据气驱增产倍数概念确定,从而建立了CO2驱阶段采出程度评价数学模型,提出将阶段采出程度逼近最终采收率的时刻作为同步埋存阶段与深度埋存阶段的转换点并引入阶段转换判据;同步埋存阶段长度扣除上产期和稳产年限即为递减期的时间长度。

    Abstract:

    The life cycle of CCUS-EOR development can be divided into two parts. One is the simultaneous sequestration phase(SSP),and the other is the deep burial phase(DBP)of CCS. Determining the time length of SSP is an important part of CCUS-EOR development scheme design. According to the change trend of oil production under CO2 flooding,SSP can be further divided into an oil production rising period,a stable oil production period,and an oil production declining period.The time length of the oil production rising period is calculated from the annual gas injection rate and the cumulative injection amount at the gas emergence time. The time length of the stable oil production period under gas flooding is calculated by means of“centralized recovery time of oil bank”. The change of stage recovery during the oil production declining period is studied by using the representative decline curves. The oil recovery rate during the stable oil production period and oil production decline rate under gas flooding are measured based on the concept of“oil production multiplier due to gas flooding”. Thus,a mathematical model for evaluating stage recovery in the case of CO2 flooding is established. The moment when the stage recovery under CO2 flooding approaches the estimated ultimate recovery is proposed as the transition point between SSP and DBP. On this basis,a phase transition criterion is introduced. The time length of SSP minus those of the oil production rising period and the stable oil production period is the time length of the oil production declining period.

    参考文献
    相似文献
    引证文献
引用本文

王高峰,曹亚明,解志薇,刘媛. CCUS-EOR开发同步埋存阶段长度的确定方法[J].油气地质与采收率,2023,30(2):168~173

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2023-05-10