Abstract:As the technology of horizontal well had been widely used in the gas and oil fields, the productivity forecast of horizontal wells will be of great importance. Based on the ellipse constant pressure surfaces near the wellbore, the author divides the seepage prob?lem of horizontal well into two parts, one is the problem in several ellipsoidal supply boundary near the wellbore, the other is the linear flow far from the well bore, based on the displacement between two similar flow mode and the law of equivalence percolation resistance,then eventually proposing a new productivity formula of horizontal well. Through case study, the results calculated by new formula has been compared with that calculated by the formulas of Borisov et al, it shows that the new result is more than the results calculated by conventional formulas, meanwhile, the new result has a small relative error compared to the practical oil production by only 10.09%.Analysis shows that this is because the resistance in ellipse drainage area is less than that in pseudo-circular drainage area, and the assumption of pseudo-circular will bring a great relative error. So, we can conclude that the new formula will not only predict the productivity accurately, but also accord with the practical flow mode of horizontal well.